Batch evidence sheet
Model, quantity, serial range, previous use, visible condition and missing items recorded before price confirmation.
Used show drones need proof. Every serious RFQ should be matched with batch-specific evidence before the buyer sends a deposit.
Model, year, quantity, previous shows and serial ranges are recorded before quotation.
Motors, propellers, arms, LED payloads, RTK modules and firmware status are inspected.
Cycle counts, voltage behavior and visible condition are screened; damaged batteries are excluded.
A representative night test and formation check are shared as buyer proof.
Flight cases, charger racks, spares and export pallets are listed before freight booking.
The third G-drive pass found inspection checklists, aircraft-placement documents and group-control manuals. The originals stay internal, but each serious buyer can receive a clean proof pack built from the same workflow.
Model, quantity, serial range, previous use, visible condition and missing items recorded before price confirmation.
Field layout, aircraft spacing, takeoff order and recovery notes prepared from the show-placement workflow.
Motors, arms, propellers, LED modules, positioning, firmware, controller and visible damage checks summarized for the buyer.
Cycle range, voltage behavior, battery exclusion list, charger count and dangerous-goods document status disclosed per batch.
Representative night test, ground-array proof and formation video shared after buyer screening.
Flight cases, battery boxes, spares, tools, software handover and training scope listed before freight booking.
Internal source files copied for extraction: inspection checklist, aircraft placement document, group-control field manual and system packing list.
Used drone-show equipment should include a practical start-up path. The public quotation can state what is included, what is optional and what remains the buyer's local responsibility.
Clean packing list, spare-parts map, battery exclusion list, software/account notes and recommended first-test workflow.
Setup sequence, battery rotation, ground-array layout, preflight check, emergency stop workflow and recovery checklist.
Optional remote support for first bench check, first field layout and first simple formation test after delivery.
Separate RFQ channel for propellers, motors, arms, LED boards, controllers, batteries and chargers matched to the delivered batch.
Public-safe examples selected from the latest D-drive archive copy. They help buyers see that the quotation is tied to real field preparation, not a generic brochure.