Inspection Process

Used show drones need proof. Every serious RFQ should be matched with batch-specific evidence before the buyer sends a deposit.

Inspection Process
  1. Batch identity

    Model, year, quantity, previous shows and serial ranges are recorded before quotation.

  2. Aircraft check

    Motors, propellers, arms, LED payloads, RTK modules and firmware status are inspected.

  3. Battery health

    Cycle counts, voltage behavior and visible condition are screened; damaged batteries are excluded.

  4. Test flight

    A representative night test and formation check are shared as buyer proof.

  5. Packing list

    Flight cases, charger racks, spares and export pallets are listed before freight booking.

Buyer proof pack prepared before deposit

The third G-drive pass found inspection checklists, aircraft-placement documents and group-control manuals. The originals stay internal, but each serious buyer can receive a clean proof pack built from the same workflow.

Batch evidence sheet

Model, quantity, serial range, previous use, visible condition and missing items recorded before price confirmation.

Aircraft placement plan

Field layout, aircraft spacing, takeoff order and recovery notes prepared from the show-placement workflow.

Inspection checklist

Motors, arms, propellers, LED modules, positioning, firmware, controller and visible damage checks summarized for the buyer.

Battery and charging record

Cycle range, voltage behavior, battery exclusion list, charger count and dangerous-goods document status disclosed per batch.

Test-flight media

Representative night test, ground-array proof and formation video shared after buyer screening.

Packing and handover pack

Flight cases, battery boxes, spares, tools, software handover and training scope listed before freight booking.

Internal source files copied for extraction: inspection checklist, aircraft placement document, group-control field manual and system packing list.

Training and after-delivery support scope

Used drone-show equipment should include a practical start-up path. The public quotation can state what is included, what is optional and what remains the buyer's local responsibility.

Pre-shipment handover

Clean packing list, spare-parts map, battery exclusion list, software/account notes and recommended first-test workflow.

Operator training files

Setup sequence, battery rotation, ground-array layout, preflight check, emergency stop workflow and recovery checklist.

Remote start-up support

Optional remote support for first bench check, first field layout and first simple formation test after delivery.

Spare-parts follow-up

Separate RFQ channel for propellers, motors, arms, LED boards, controllers, batteries and chargers matched to the delivered batch.

Field proof from the fourth material pass

Public-safe examples selected from the latest D-drive archive copy. They help buyers see that the quotation is tied to real field preparation, not a generic brochure.

Night ground array of show drones before test flight
Night ground-array layout Wide night setup photo showing aircraft placement before a fleet test.
Show drone flight cases and aircraft placed on site
Flight cases on site Field photo showing transport cases and staged aircraft during preparation.
Green LED ground test with show drones on field
Green LED ground test Ground lighting test frame for checking LED response before takeoff.
Red LED ground test with show drones on field
Red LED ground test Second LED test frame showing color verification and field control context.